Final Construction Update

Over the past few weeks, we've had all sorts of crews working in the space.  We installed a walk-in cooler...then took it out and installed a bigger one (that's a story for another day).  The bar has been built.  Signs are up on the front of the building and inside.  The lights are hung.  The bathrooms are functional.  The walls have been painted.  The floors have been repaired and cleaned.  The draft system is in place. Over the course of the long weekend, we've been putting some finishing touches on a few things and getting the store in ship shape for the grand opening.  Then, once we pass all of our inspections early next week, we'll move in the bar stools, tables, chairs, and shelves, and start ordering some beer!

As you can tell from the photos below, things are getting REALLY close.  However, we still have inspections to pass and inventory to be done, but we are finally comfortable enough to announce our grand opening plans for August 13 - 20!

Screen Shot 2014-08-27 at 11.21.30 PM
Screen Shot 2014-08-27 at 11.21.30 PM
Screen Shot 2014-08-27 at 11.23.34 PM
Screen Shot 2014-08-27 at 11.23.34 PM
IMG_0131
IMG_0131
IMG_0135
IMG_0135
IMG_0139
IMG_0139
IMG_0146
IMG_0146